Colossus RoofingLifetime Metal & Exterior Systems

Services · Replace shingles or cedar with metal

Replacing an asphalt or cedar roof with metal

Most of our residential work is this job: a house on its second or third asphalt roof, or a 1980s cedar shake roof past saving, going to metal for the last time. The work is more than swapping the covering. The old roof comes off, the deck is checked and repaired, cedar roofs on skip sheathing get a new plywood deck, and the flashings, vents and underlayment are built new for a roof that will outlast the next three shingle roofs.

  • Systems standing seam, metal shingles, corrugated
  • Cedar roofs new plywood deck in the scope
  • Underlayment high-temperature synthetic over the whole deck
  • Time on site 3 to 7 days for most houses

Ask about replace shingles or cedar with metal

Free in-person measure and a written quote.

No obligation. We measure in person before quoting.

The work

What the job involves

Day one is tear-off: shingles or shakes, old underlayment and flashings down to the deck, loaded straight into a bin. Then we look at the plywood. Shingle roofs usually need a few sheets replaced around chimneys, valleys and eaves. Cedar roofs on spaced boards need a full plywood deck, because metal panels need continuous support and a surface the underlayment can seal to.

Next comes the dry-in: a high-temperature synthetic underlayment over the whole deck, ice and water membrane at eaves and valleys, and new drip edge. Then the metal: panels or shingles, every wall, chimney and skylight re-flashed in matching metal, ridge and hip caps, and vents sized to the attic. Gutters are the last thing on and usually worth replacing at the same time, since the eave trim changes.

What our quote includes

  • Full tear-off and disposal, number of existing layers stated
  • Plywood allowance per sheet, and the full re-deck price if the roof is cedar
  • High-temperature synthetic underlayment and where ice and water membrane goes
  • New step, counter and apron flashing at every wall, chimney and skylight
  • Ridge, hip, eave, gable and valley trim in matching metal
  • Vents: how many, what type, and soffit intake if it is short
  • The panel profile, gauge, finish and colour, named
  • Manufacturer finish warranty and our workmanship warranty, in writing
  • Start date, days on site, and how we protect the house, deck and garden
Watch for: A metal roof quoted on a per-square price with no tear-off, no plywood line and no flashing detail. The panels are the easy part; a metal roof leaks at the flashings, if it leaks at all.

Worth knowing

Metal over shingles, or tear off?

The BC Building Code does not forbid installing a new roof over one layer of shingles, and some metal shingle systems are designed for it. It saves the tear-off and disposal. We do it when the existing roof is flat, dry and a single layer, the deck is sound, and an underlayment goes over the shingles so granules cannot abrade the metal.

We tear off when there are two layers, when the deck has soft spots, when the roof is cedar, or when the homeowner wants to see what is under there. On an old house that is most of the time, and we would rather find rot now than under a 50-year roof.

Price your roof from the satelliteFind your address, outline the roof, pick the system. A price range for your own roof, emailed in minutes.
Open the estimate tool →

Questions

Replace shingles or cedar with metal questions

Do I have to replace the plywood under a cedar roof?

Almost always. Cedar shakes were laid on spaced boards so they could dry from below. Metal panels need continuous support and a surface the underlayment can seal to, so a cedar tear-off includes a new plywood deck, typically $2 to $5 per square foot.

How long will my house be a work site?

Three to seven days for most houses: a day or two of tear-off and deck work, a day to dry in, and two to four days of metal. Weather can stretch that, and we never leave a roof open overnight.

Should I replace the gutters at the same time?

Usually. The eave trim and drip edge change with a metal roof, gutters on a metal roof need hidden hangers and a slightly lower position, and doing both at once costs less than coming back. We quote them as a separate line so you can decide.

Related

Guides

Need replace shingles or cedar with metal?

We reply within one business day and measure in person before quoting.